AutoEstimate AI
Open workspace
No waiting timesAI estimating · Takeoff · Building quotes

AI building quotes and plan takeoff. Instantly.

Simply upload your drawings and get a full, broken-down quote ready to send to your client — measured quantities, UK pricing, exclusions and payment stages.

Upload drawings. Get a quote ready to send.

Instant takeoff, instant costing, instant quote: no waiting for a surveyor, no quote to chase. Your first job's total price is free.

Upload drawings

No waiting times

Takeoff and costing happen the moment your drawings go up. Nothing to chase, nobody to wait on.

Instant takeoff, instant quote

Quantities measured and priced on UK rates as you work, so the quote is ready in one sitting.

Ready to send to your client

A full broken-down quote with exclusions and payment stages, as PDF or Word.

How it works

1. Upload drawings

PDFs or images. Set the scale once per sheet and the AI takes off quantities instantly.

2. Get the costing

Every line priced on UK rates for your postcode, with your overhead and profit.

3. Send the quote

Download a branded PDF or Word quote, or share a link your client can accept online.

See it in action

Real screens from a single-storey rear extension in Essex.

AutoEstimate AI itemised estimate screen

Itemised estimate

Every package broken down into materials, labour, plant and subcontract, priced for the UK.

AutoEstimate AI internal cost pack screen

Internal cost pack

Slide overhead, profit and deposit. Your margins stay private and the totals update live.

AutoEstimate AI client-ready quote screen

Client-ready quote

Branded quotation with scope, exclusions, payment stages and VAT. Download PDF or Word.

AutoEstimate AI build timeline screen

Build timeline

Enter a start date and get a week-by-week programme to completion. Fully editable.

Scaled takeoff

Calibrate each sheet from a known dimension, verify it, then count, measure and area-off with confidence.

Blind-spot checks

Steel, deep footings, consumer units, build-over agreements: allow for them or exclude them in writing.

Two documents, one estimate

A confidential cost pack for you and a clean, branded quote for your client. Margins never leak.

Procurement and site packs

Supplier-ready buying lists and unpriced QA sheets with drawing references for the trades.

Questions

How long does a quote take?

No waiting times. Takeoff, costing and the quote are produced as you work, so you can send a broken-down quote to your client the same day.

How does AutoEstimate AI price a building job?

Upload your drawings, set the scale, and the AI proposes quantities. Prices come from UK recipe rates adjusted for your postcode, with your overhead and profit added.

Can I use it for a single trade?

Yes. Switch between full build and single-trade mode for electrics, plumbing and heating, brickwork, roofing, carpentry or groundworks.

Will my client see my margins?

No. The client quote shows prices by trade package only. Your rates, labour and margins stay in the internal cost pack.

How much does it cost?

Your first job shows the total price free. A full quote and breakdown is £39.99 per job, or £100 for jobs over 10 drawings.

Start your free quote